Monday, July 9, 2012

Preparations, and dreaming of a laundry

corrugated metal to enclose space
above a stone retaining wall
It is quite chilly, but we are plugging away making some slow progress on the back extension work.  This part looks quite boring, but it is important to have the basics and foundation pieces done (right ?!). We have stone retaining walls at the back of the property and need to seal them up, so rain does not come into the area.  Once it is all enclosed into  a studio this will be more important a consideration.   Also some of the retaining wall has been repaired and fixed up.  The inside of the retaining walls will be properly lined.  And the space in this area will have skylights, plus nice bright lighting.

We will be using corrugated metal siding for some of our enclosures, so we have started the work on that.

a rather ugly space in back,
enclosed by thick stone retaining walls
Here is an old picture of the inside of the space bounded by the retaining walls.  A rather ugly space, and not very pleasant.  We took a half a container load out of storage one year ago and have had a lot of the stuff stacked up in there, so like shed or garage.   It is still a holding pattern for a lot of it.  Still, I can imagine two working areas here.  One (left, where you see white wall) is a beautiful but utilitarian laundry.  The other, to right, where you see the horrific minty green walls, is to be a small workshop storage area.  To the left of the laundry will be a large lofty and airy high ceilinged studio and workshop space, with outlook to the garden.  French doors opening facing the red brick pathway we paved on the other side (not shown).  And a doorway at bottom of steps shown above (which lead to a good old Australian icon--a Hills Hoist laundry line...and though ugly, it happens to occupy the best aspect on the property for its job of sunning, airing, and drying clothes.  Plus, it is not visible from the parts of the house where we would entertain, and won't even be an eyesore visible from the new studio.   So, it may just stay for a while !)

I do not like Ugly Spaces, but with some imagination, it is possible to consider a more attractive space.

the roof looks low here, but that
is because the rear of the house is facing a
sharp slope, and property is terraced with
retaining walls.  This area is up the steps
seen in previous photo above
Still, many influences at the moment require us to be first utilitarian and functional in our consideration. By this I mean to say, we wish to spend less than originally planned on this part of the build !  I truly had grand ideas for the laundry especially, a full wall of cabinets, including a tall one for stowing the vac, mops and brooms.  A new front loader washing machine (that of course, uses less water and electricity--clear benefits).  A stunning farm sink and a tall necked tap to facilitate filling buckets or whathaveyou !  Gorgeous painted finishes on the cabinets.  A compromise already accepted into the design was a bathroom (toilet and shower) in the room, instead of having a separate bathroom.  But I have been pulling great ideas on combined laundries and bathrooms, so I was ready for a clever layout and finishes that would make lovely conditions for clean up chores (and as a good Virgo/Libra lady, I do like my clean up chores, but ideally their space should also be beautiful).

Alas, practicality of budget constraints at the moment mean that Laundry v1.0 will be a less glamourous affair.  Instead I am reviewing all my sources for clever cleaver ideas that cost Very Little !!  Industrial chic, here I come.  Furiously, I am scanning all my references for anything functional that is not expensive, that can also be interpreted into cool or chic !!  The wall of cabinets is out for now.  The front loader machine will be a refresh when top loader can't go on working.  We will redeploy an old stainless steel sink and drainer we removed from the original kitchen.  (A glimmer of sunshine in this plan will be the sink can get a new tap, as the old one was so grotty and yucky, it fell into a skip bin long ago).  So stay tuned for more about the Laundry v 1.0 fit out  in a coming up post (and find out what is actually left in the design).  All I can say, is it should not be the end of the world, as this story got played out over and over again for our main bathroom renovation, where every lovely idea I had at the ready got brutally dashed by Engineering and Construction Departments, usually due to poor feasibility or some structural thing I had to respect/accept.  In the end, it did turn out nicely.  Though resembling nothing like any of the ideas I had in various stages of redesign !

There is a door leading to the back side of the house, also a space bounded by retaining walls. We have lots of retaining walls, because the house is built on a slope.  They are well constructed, solid, and well engineered too.  So we have decided to work with the retaining walls, and use them as perimeters or parts of our structure.  The door to the side of the house need replacement.  It was not really used much before, so did not have to be super serviceable.  But now it will get used.  Turns out it was in quite poor  condition.  This makes it the third door Ian has had to completely fix, pretty much from pieces and put all back together, but better.  I suppose we could buy a new door.  But the work is now done, it took a couple days.  He had to reglaze it and managed to use some old textured glass from an interior door we will not keep.  Most importantly, he completely fixed and repaired to good service the original old lock.
The back area is still a holding area for stuff
(but way cheaper than storing it off premise !)
restored old door is shown at right, with
glazed light.  The Falcon is front and centre !

The photo showing the door is not very impressive and lighting was not my friend when I photographed it.  The sculpture you see is The Falcon, perched on its (very heavy) solid sandstone plinth.  The Falcon will move when we have finished and decided its home here !  (in our previous home it kept watch and looked out the sunroom window).

I hope to make the next post more aesthetically pleasing !  However, I know from our earlier renovations that this stage is very much about a working construction site and conditions.  I may be the Design Director (and Finance and Procurement Departments too, plus the Planning Commissioner), and have input.  But Director Engineering and Construction is clearly in charge at this stage !!  Still, as I like to do, I will try to find something nice about the view to capture :)

Saturday, May 19, 2012

Telling Time


In the Lounge/Living Room.  Sitting on Fireplace Mantel.
Vintage clock with ceramic parrots glazed in iridescent finish.
Acquired at Bowsers of Barossa.
We love clocks and timepieces here.  Especially ones with good character.  Ian is a self taught and rather talented watchmaker, he restores vintage mechanical watches from the 1880- 1930s era and is now making watchcases in titanium.  So time keepers are favourite items in our home.  Practical and also beautiful.

I like to be able to see what time it is in every room, without having to look at a watch (maybe I am not wearing one at that moment ?!)...or my mobile phone.  So the goal is a gorgeous clock in every room, so I have only to glance to know what time it is.  It doesn't matter so much to me if the clocks are vintage or not, but good looks and character definitely count.  Though, some of the clocks you will see below are more symbolic than exact or actual time measuring.  Some are set statically at times, like close of business, cat dinner time or wine o'clock.  Others don't tell time at all !  But I love them all.

Check out some of our collection, deployed in various vignettes and settings here at home.
Master Bedroom.  Cool looking shiny chrome
clock in fob watch style.
Sourced from Ironstone Cottage in Tanunda.
In the Kitchen.  big vintage Telechron Clock,
with verdigris chippy finish.
Sourced from davidmetnicole, Surry Hills.
Complemented by pale green enamel tea kettle.
Love the greens !  In the Lounge/Living Room.
French vintage hexagon shaped LePaute clock.
Also sourced from davidmetnicole, Surry Hills.
Above a framed
antique map of Great Britain, map found in an
antique arcade on my travels in UK.
In my office:  vintage style old clock,
Chinese paintbrushes found in Beijing markets, and
two charming encaustics paintings by Jacqueline Coates
Alos in my office.
Fab vintage 50s era Tonka farm truck,
vintage globe, and a big clock dial.
All found on & acquired from ebay.
Again, my office.  Old ceramic clock dial,
detail from a stunning oil painting Too Small for Me,
by Marie Peter-Tolz, 2010, Paris. 
Close up of vignette on fireplace mantel in my office
"K" is for Kim
(Timber K inherited from my grandfather,
graced his office for years
sitting atop an antique shorthand book)
ceramic clock dial and oil painting backdrop

Saturday, May 12, 2012

Exterior Colour Scheme, now in progress

original colour scheme as when we bought the house
Our old stone house is made of what is called blue stone, with some dark steely blue stones in the mix.  It also has stones in rust, beige and other hues.  The exterior trims on the house are very bright, a deep/bright gold ochre and a dark indian red.  We have intended to change this to a more neutral scheme, but the work pushed out as we did the complete interior renovations.

However, we await planning permissions for our studio space in back, so other jobs we left for later are getting pulled forward to do now while we wait.  One of the jobs to do was to restore a door in the front, a door we don't use for entering/exiting the house, but that is of a very poor condition.  It was very drafty, having holes you could look through from inside out.  So poor in condition that when the rain blows towards the front of the house, water flowed through every edge and every timber panel of that door.  Ian decided to take the door off, restore it, and then seal it up.  It would still look door-like, but would be weather proofed.

the restored door in front,
in new colour scheme
windows to left also painted
The job was not as simple as it seemed.  Some of the timber door framing and also timber panels to sides of the door were rotted, because a gutter near by had a leak and let water splash onto it.  The timber rotted probably over a number of years.  Ian had to cut it all away and replace it.  When the job was all done, he did not want to paint the door the same previous colour, because we intend to change the exterior trims to a more neutral scheme.  The door needed priming, then painting.  Once only please.

I was dispatched to get exterior paints (I am the Procurement Director here !).  Masonry would be painted over from gold to grey.  Timber work on door and window frames from gold or red into charcoal, in a  Colourbond colour called Monument that matches guttering on the shed and back patio/pergola.  Eventually we will replace the guttering here too, and it will be replaced in Monument colour.  The door is painted a dark steely blue.  

left side of house has new trims colours
guttering and roof not done.
Front gable and right side not yet done.
(house will look mix-match for a while)
(eventually the roof will be cleaned, primed, and painted over in a Micaceous Iron Oxide paint, we are considering Murobond Bridge Paint for that.  Probably a mid grey colour.  This will be a big job and will require good weather conditions too, thinking late winter or early Spring might be the right timing).

 south side windows look MUCH better
in new trims colours
You can see some of the work in progress.  Ian started on the door he restored and is working around to the left of the house.  It is more easily accessed with ladders we already have.  Painting window framing is a very slow and tedious job.  Also, windows need to be removed, so he can scrape years of old paint off them, or off the glazing, and fill, sand and paint anew.  But gosh does it ever look good when done !

back entrance,
now painted in new trims colours
This week he made it to one of our back entrances.  The door here will get done over in the dark steely blue too.  That will "quiet" its look down, to more of an elegant whisper (the red is very brash).  The door's paint job is delayed until next week because that door needs restoring too, on closer inspection it was not as solid and sound as we had thought to hoped.  

the kitchen window and door frame are
painted in new trims colours.
Door will get its new colour soon, steely blue.
Reglazed window above door looks very good,
other two old coloured glass windows
to be reglazed next week
Another delay was the window above the door.  It was a "legacy" window in pink textured glass, next to another window like it in same colour, and one to side of door in green textured glass.  The textured glass panels were cracked, and on the Replace Someday list.  But that list is always long, and some things sit on it a while, waiting for other work to be done, or for funds for their turn to come up.




window above the door shattered,
needs new glazing
Anyways, Ian touched the top window and it shattered to bits.  He had to stop other painting work, go find some glass to reglaze the window.  By the end of the day it was done.  Looking lovely in a cathedral pattern clear glass.    Now the other two windows look all wrong, so their Replace Someday turn may come next week.  When all of them are done, the door  and window frame painting can be completed.

The whole job will take some time to complete.  So our house exterior will look a bit disjointed until it is done.  But it is great to see where it is going and it feels like the changes will enhance the house's curb appeal.

I am loving the look of the old red brick paving in back entry with the more neutral trims colours.  All very complementary to the stonework, letting it be more noticeable as a feature.  Which is part of the point !